Loos and Company Blog

Our Products

Loos and Company has over 50 years of experience in the wire and cable industry. With our knowledge and experience, we can offer the highest quality products available on the market. Our general product lines and capabilities are listed above. As a manufacturer we can provide customized products for any application. If you have any questions or wish to learn more about our products and capabilities, visit our product specific pages or contact us.

New Call-to-action

New Call-to-action

New call-to-action

Loos HotWire: LoosCo.com's Blog

Loos Green Projects

Dec 17, 2010 07:44 AM

Loos & Co, Inc.Loos & Co., Inc. is built on a proud tradition of innovation in the seemingly old-line industry of steel fabrication.  Over our more than fifty years of existence we have grown from a two car garage start-up to the acknowledged industry leader.  Accomplishments like that only happen by doing things right. 

C  Documents and Settings ROBERT.LOOSCO My Documents Web Site Web Site Design Pictures Compressed Images ASSEMBLIESThis attitude of doing things right extends beyond our manufacturing processes to how we act as a corporate citizen.  While there has been much press of late on the subject of environmental conservation, we have long been concerned with the impact we make on the environment and have been practicing conservation for years.  We thought you might be interested in some of the “green” projects we have initiated over the years to reduce our environmental footprint.

1) 1993 – Replaced hundreds of lights, motors, belts, and drives with energy efficient versions. The estimated electrical saving was over 190,000 kilowatt-hours per year. 

Stainless Wire rope 2) 1999 – Thirty ton chiller heat diverted. The exhaust heat from this process chiller was diverted into the adjacent Rope Mill department to provide area heating. This provides heat to approximately 17,000 square feet of factory space. There is no furnace in this area and therefore no oil is burned for localized heat.

 3) 2000 – A second thirty ton chiller’s waste heat was diverted to the tinning area for heat. The exhaust heat from this process chiller was diverted into the adjacent department to provide area heating. This provides additional heat to approximately 6,000 square feet of factory space. There is no furnace in this area and therefore no oil is burned for localized heat.

cable assemblies4) 2000 – Approximately thirty motion sensors were installed in the office areas to control individual office, meeting, and common area room lighting. By setting these on automatic lights turn off when areas are unoccupied. The estimated electrical saving was 2080 kilowatt-hours per year.

 5) 2000 – Annealing Furnace heat reclamation. Air handling units were installed to capture the heat given off by the annealing furnaces. Two units divert heat into adjacent manufacturing areas and two re-circulate and distribute the heat to other areas of the same large room. There are no oil-fired furnaces in this area and therefore no oil is burned to heat approximately 45,000 square feet of factory space.

 6) 2001 – High-speed doors. Automatic high-speed curtain doors were installed to isolate an air-conditioned area of the factory. By making the operation automatic and fast, we conserve the energy needed to cool 7,000 sq-ft of floor space.

 7) 2001 – Air leak survey & repair. A complete compressed air survey was performed to identify and repair leaks. Compressed air is an essential component in equipment operation, however it is also a costly form of energy. The program saved over 200,000 kilowatt-hours per year in electrical power that otherwise would have been wasted.

 8) 2001 – Air System Upgrade. A major system upgrade increased the efficiency of the compressed air system, mostly in storage and distribution. Main trunk lines, a full process loop, and a large storage tank helped to improve the efficiency of the system, saving over 260,000 kilowatt-hours per year in electrical power.

 9) 2004 – All main office entrances have been updated to include a secondary weather boundary (vestibule or similar). This added insulation retains heat in winter and reduces the load on our air conditioning in the summer. 

stainless steel wire10) 2005 – Factory lighting - Phase I.  We replaced 281 light fixtures with energy efficient T-5 fluorescent lights. In addition, 26 motion sensors were installed so that lights would turn off automatically when areas were not occupied. This program saved over 354,000 kilowatt-hours per year in electrical power.

 11) 2006 – Factory lighting - Phase II. We replaced an additional 280 light fixtures with energy efficient lights. In addition, another 40 motion sensors were installed so that lights would turn off automatically when areas were not occupied. This program saved approximately 114,000 kilowatt-hours per year in electrical power.

 12) 2007 – Water saving fixtures. Water saving fixtures were installed in restrooms thought out the facility. New automatic faucets & low water (or no water) fixtures have helped reduce our water consumption by an estimated 60,000 gallons per year. 

 13) 2007 – Waste oil furnace. A special furnace was installed to burn waste oils and other combustible fuels. This provides heat to a large manufacturing area. By using this oil for heat, we have reduced the total amount of heating oil that we purchase by 1,500 gallons during the first heating season. This saving is expected to double next year.

galvanized wire rope14)  2007 – Printed Catalogs – Electronic version of our catalog made available online instead of only in paper form. Additionally the catalog is made available on CD-ROM further reducing paper consumption by reducing paper printing and mailing materials.

 15) 2007 – 125 HP high-efficiency motor & drive replacement. A high efficiency A/C motor replaced a very old DC motor and generator set saving over 260,000 kilowatt-hours per year in electrical power. This electrical savings would power over 400 average homes each year!

 16) 2010 – Loos & Co., Inc. installed a 2 megawatt generator to support Connecticut’s load management program. This program allows Loos to generate our own power in the event of a “load shed” event.  The program sponsored by CT Light and Power (CL&P) reduces electrical demand during peak hours, usually the hot summer months.

 C  Documents and Settings ROBERT.LOOSCO My Documents Web Site Web Site Design Pictures Compressed Images wire reels(3)17) Recycling Programs
 a) all light bulbs
 i) HPS
 ii) Mercury
 iii) Fluorescent
 b) All dry batteries
 i) alkaline
 ii) Nickel-cad
 iii) Nickel-metal-hydride
 c) Extrusion waste / plastic
 d) Drawing (process) oil
 e) Scrap (process) metal
 i) S/S
 ii) Carbon Steel
 iii) Phosphor Bronze & other non-ferrous
 iv) Aluminum 
 f) Cardboard
 g) General waste is sorted and burned, not land-filled